Levee Raising Near Lake “A-2”

Since the completion of the Ditch “B” and Lake “A-2”/Pond “A-3” projects in mid-2022, the District has undertaken a third project to complete the raising of the levee just south of Double Lakes Dr.

The former projects did not produce enough excavated material to raise the entire levee.  This third project is in concert with an excavation project within FBC LID 2 and the District is using that material to raise the remaining portion of the levee.  Construction traffic will be accessing the site using the Double Lake driveway near the Heritage Colony Clubhouse.

The project began in late May and is expected to be completed by December, 2023.